Get the latest price? We will reply as soon as possible (within 12 hours)

  • What to Do About Bubbles in Furniture Roller Coating?
    02-06/2026
    UV roller coating machines have high requirements for coating viscosity, typically controlled between 20 and 40 seconds. If the viscosity is too high, a special thinner can be added appropriately (do not use ordinary solvents) to improve leveling and help expel air bubbles.
  • Is the UV Roller Coating Machine Noisy?
    02-05/2026
    According to industry testing data and actual measurement experience, the overall noise level of a standard UV Roller Coating Machine is approximately 75 decibels. This falls within the range of medium-level industrial equipment noise – higher than a typical office environment (approximately 55 dB).
  • Does a UV Roller Coating Machine require preheating before operation?
    02-03/2026
    In most normal temperature (20~25℃) production environments, the UV Roller Coating Machine usually does not require long-term preheating. The temperature difference between the machine's metal parts and the environment is not significant, and the fluidity of the UV coating is within a reasonable range.
  • What Causes Sagging in UV Roller Coating Machines?
    01-22/2026
    UV Roller Coating Machines typically require paint viscosity within a certain range (e.g., 25–60 seconds/Ford-4 cup). If the viscosity is too low, the coating cannot form a stable film on the roller surface, and it tends to spread too quickly on the board, causing it to sag due to gravity.
  • Which UV Paints are Suitable for a UV Roller Coating Machine?
    01-16/2026
    The most common and highly compatible UV paints for roller coating machines include: UV primers, sealers, intermediate coats, high-gloss topcoats, matte topcoats, and clear acrylic systems.
  • How Much Space Does a Furniture Factory Need to Install a Roller Coating Line?
    01-15/2026
    Single Machine Configuration (Basic Type) Suitable for small furniture factories or sample lines, including only: Infeed section + 1 roller coating machine + 1 UV curing machine + Outfeed section. Space requirements are approximately: Length 10–12 meters, Width 4–5 meters, Height over 3 meters.
  • Which UV Roller Coating Machine is Used in a Furniture Production Line?
    01-06/2026
    Furniture coating requires high precision and consistency. Single-roller or double-roller structures often cannot meet the complex process requirements; therefore, most furniture factories choose multi-roller UV Roller Coating Machines.
  • How Many People Are Needed to Operate a UV Roller Coating Machine?
    01-01/2026
    A UV Roller Coating Machine in a furniture factory typically requires only 2-3 people to operate efficiently. Among them: • 1 person responsible for equipment control and process monitoring; • 1 person responsible for material feeding and receiving; • Depending on production volume, one additional person can be added for assisting with handling and inspection.
  • Can a UV Roller Coating Machine run continuously for 24 hours?
    12-30/2025
    Coating machines, UV curing machines, and sanders are linked through an automated control system, maintaining a stable 24-hour production line cycle. However, it's important to emphasize that theoretical feasibility does not guarantee practical sustainability.
  • How to Clean a UV Roller Coating Machine After Shutdown?
    12-29/2025
    Step 1: Shut down the equipment and power system. Step 2: Drain the paint system. Step 3: Clean the roller surface. Step 4: Clean the scraper system. Step 5: Clean the paint tank and conveying system. Step 6: Clean the pipes and pump.

Get the latest price? We will reply as soon as possible (within 12 hours)

Contact Us