Get the latest price? We will reply as soon as possible (within 12 hours)

  • How Many Machines Are Needed to Install a Roller Coating Line?
    02-09/2026
    Depending on the product type and coating requirements of different companies, a furniture roller coating line typically requires 8 to 15 machines to form a stable and efficient production system. The key equipment required for each process will be analyzed below.
  • What to Do About Bubbles in Furniture Roller Coating?
    02-06/2026
    UV roller coating machines have high requirements for coating viscosity, typically controlled between 20 and 40 seconds. If the viscosity is too high, a special thinner can be added appropriately (do not use ordinary solvents) to improve leveling and help expel air bubbles.
  • Is the UV Roller Coating Machine Noisy?
    02-05/2026
    According to industry testing data and actual measurement experience, the overall noise level of a standard UV Roller Coating Machine is approximately 75 decibels. This falls within the range of medium-level industrial equipment noise – higher than a typical office environment (approximately 55 dB).
  • Does a UV Roller Coating Machine require preheating before operation?
    02-03/2026
    In most normal temperature (20~25℃) production environments, the UV Roller Coating Machine usually does not require long-term preheating. The temperature difference between the machine's metal parts and the environment is not significant, and the fluidity of the UV coating is within a reasonable range.
  • How to Configure a Curtain Coating Machine Production Line?
    01-27/2026
    Basic Configuration (Suitable for small and medium-sized furniture factories) Production line process: • Feeding → Dust removal → Curtain coating machine → Leveling → UV curing machine → Unloading
  • Is a curtain coating machine suitable for irregularly shaped parts?
    01-23/2026
    Ideal workpieces for curtain coating machines typically possess the following characteristics: • High surface flatness • Regular geometry • No obvious depressions or protrusions • Ability to pass through the liquid curtain zone at a constant speed These conditions indicate that curtain coating machines are inherently more suitable for planar or simple geometric shapes.
  • What Causes Sagging in UV Roller Coating Machines?
    01-22/2026
    UV Roller Coating Machines typically require paint viscosity within a certain range (e.g., 25–60 seconds/Ford-4 cup). If the viscosity is too low, the coating cannot form a stable film on the roller surface, and it tends to spread too quickly on the board, causing it to sag due to gravity.
  • Which UV Paints are Suitable for a UV Roller Coating Machine?
    01-16/2026
    The most common and highly compatible UV paints for roller coating machines include: UV primers, sealers, intermediate coats, high-gloss topcoats, matte topcoats, and clear acrylic systems.
  • How Much Space Does a Furniture Factory Need to Install a Roller Coating Line?
    01-15/2026
    Single Machine Configuration (Basic Type) Suitable for small furniture factories or sample lines, including only: Infeed section + 1 roller coating machine + 1 UV curing machine + Outfeed section. Space requirements are approximately: Length 10–12 meters, Width 4–5 meters, Height over 3 meters.
  • Is an MDF UV curtain coating machine suitable for thick or thin coating?
    01-12/2026
    That adjusting the coating thickness mainly relies on the balance between flow rate, viscosity, and conveyor speed. This means that a curtain coating machine can achieve both thick and thin coatings, provided the parameters are set correctly.

Get the latest price? We will reply as soon as possible (within 12 hours)

Contact Us