Get the latest price? We will reply as soon as possible (within 12 hours)

  • How Much Space Does a Furniture Factory Need to Install a Roller Coating Line?
    01-15/2026
    Single Machine Configuration (Basic Type) Suitable for small furniture factories or sample lines, including only: Infeed section + 1 roller coating machine + 1 UV curing machine + Outfeed section. Space requirements are approximately: Length 10–12 meters, Width 4–5 meters, Height over 3 meters.
  • Is an MDF UV curtain coating machine suitable for thick or thin coating?
    01-12/2026
    That adjusting the coating thickness mainly relies on the balance between flow rate, viscosity, and conveyor speed. This means that a curtain coating machine can achieve both thick and thin coatings, provided the parameters are set correctly.
  • Are Curtain Coating Machines Prone to Paint Sagging Issues?
    01-08/2026
    The coating thickness of a curtain coating machine is determined by both the liquid flow rate and the conveying speed. If the flow rate is too high and the speed too slow, the coating thickness increases, and the surface tension is insufficient to support gravity, easily leading to sagging.
  • Which UV Roller Coating Machine is Used in a Furniture Production Line?
    01-06/2026
    Furniture coating requires high precision and consistency. Single-roller or double-roller structures often cannot meet the complex process requirements; therefore, most furniture factories choose multi-roller UV Roller Coating Machines.
  • Is a Curtain Coating Machine Suitable for Furniture Boards?
    01-02/2026
    Furniture panel surfaces typically require a smooth, even surface, consistent color, and good adhesion and abrasion resistance. The Curtain Coating Machine's coating method perfectly meets these requirements.
  • How Many People Are Needed to Operate a UV Roller Coating Machine?
    01-01/2026
    A UV Roller Coating Machine in a furniture factory typically requires only 2-3 people to operate efficiently. Among them: • 1 person responsible for equipment control and process monitoring; • 1 person responsible for material feeding and receiving; • Depending on production volume, one additional person can be added for assisting with handling and inspection.
  • Can a UV Roller Coating Machine run continuously for 24 hours?
    12-30/2025
    Coating machines, UV curing machines, and sanders are linked through an automated control system, maintaining a stable 24-hour production line cycle. However, it's important to emphasize that theoretical feasibility does not guarantee practical sustainability.
  • How to Clean a UV Roller Coating Machine After Shutdown?
    12-29/2025
    Step 1: Shut down the equipment and power system. Step 2: Drain the paint system. Step 3: Clean the roller surface. Step 4: Clean the scraper system. Step 5: Clean the paint tank and conveying system. Step 6: Clean the pipes and pump.
  • Is a UV Roller Coating Machine Suitable for Small-Batch Furniture Production?
    12-26/2025
    From a coating process perspective, a UV Roller Coating Machine is perfectly suitable for small-batch production, provided that the company correctly configures the equipment parameters and production process.
  • Is Coating Bubbling Caused by the UV Roller Coating Machine?
    12-24/2025
    When the speed difference between the metering roller and transfer roller of a UV Roller Coating Machine is too large, shear bubbles can form in the coating layer. Especially under high-viscosity coating conditions, these bubbles are more difficult to escape, resulting in "pinhole" or "bulge" defects during curing.

Get the latest price? We will reply as soon as possible (within 12 hours)

Contact Us